BIMforLean

Tekes FidiPro Project – 2013 – 2016

Department  of  Civil  and  Structural  Engineering Dr.  Bhargav  Dave

Senior  Researcher 02/12/2015

(2)

Project  Information

• Tekes – Finnish  Distinguished   Professor  Scheme   (FidiPro)

• Prof. Lauri  Koskela  – FidiPro Professor

• Dr. Bhargav  Dave  – Senior  Researcher

• 2013  – 2016

• Total  funding  -­ ~0.9M  €

• 12  partners

• Part  of  the  Aalto  BIM  initiative

(3)

Programme

• WP  1  – Linkages  between  Lean  and  BIM

• WP  2  – Field/Mobile  Computing

• WP  3  – Commercial,  organisational and   design/production   arrangements

(4)

Steering  Group

(5)

WP  1  – Linkages  between  Lean  and  BIM

• Determining  links  between  lean,  BIM  and  sustainability   and  highlighting   tools  that  support  them

• Developing   guidelines   for  realizing  the  synergy  between   Lean  and  BIM  in  key  stages  of  the  project  process

• Developing   and  trialling  a  detailed  but  flexible  design   management  system  using  lean/BIM.  Specifically  using   tools  such  as  Set-­based  design,  Target  Value  Design,   collocation  of  teams  and  the  Last  Planner  System™

(6)

WP  2  – Field/Mobile  Computing

• Developing   applications   that  exploit  state-­of-­the-­art   mobile  computing  and  communication  technologies   to   enhance  and  support  lean  construction  activities

• Improving  the  progress  monitoring,  fit-­out,  hand  over  

and  Facility  Management  (FM)  systems  through  the  use   of  BIM,  mobile  computing  and  surveying  systems

• Exploring  opportunities  for  knowledge  management  

using  mobile  technologies  on  field  and  develop  potential   solutions

(7)

WP  3  – Commercial,  organisational and   design/production  arrangements

• Determining  the  common  problems  caused  by  incompatible   commercial  and  organizational  arrangements   as  observed  in   lean  and  BIM  implementation  and  their  root  causes

• Identifying  and  evaluating  the  state-­of-­the-­art   commercial  and   organizational  practices  in  lean  and  BIM  implementation

• Determining  initial  principles  for  the  simultaneous  design  of   mutually  compatible  commercial,  organizational  and  

design/production   systems

• Trialling of  the  mentioned  principles  to  integrated  solutions  for   the  design,  production  and  installation  of  HVAC  systems

(8)

Outputs/Outcomes  – Overview

• Over  30  research  papers

• 7  workshops  organised/contributed

• 5  bachelor’s  theses

• 5  Master’s  theses  (2  under  progress)

• 2  Doctoral  Students  (Ongoing)

• 3  funded  research  projects

– VisiLean,  Tekes

– ViBR,  Tekes (Led  by  Vianova Oy)

– Intelligent  Products,  Highways  England

• 1  start-­up

(9)

Construction   project  workflow   (who,  what,  when)   with  synchronised 3D  model

Mobile  app  for  on-­

site  use  (start,   alert,  finish)

is  the  only  production  management  system  that  combines  Lean  workflows  and Building  Information  Model  (BIM)  visualisation in  a  cloud  based  service.

VisiLean is  highly  intuitive  to  use  and  can  be  accessed  from  

any  type  of  computer  or  mobile  device  using  a  standard  web  browser.

VisiLean

Now  a  Finnish  Startup!

(10)

Screenshot  1

Gantt  +  3D  view

BIM   element   browser

Gantt   view of  project

BIM   3D  view

Selected task details

(11)

VisiLean Photogrammetry

Panoramic photograph

As-built visualisation

Detectable deviation from design

Projected geometry from the BIM model Creating as-built

information automatically!

(12)

VisiLean  AR

(13)

ViBR – Virtual  Big room

• A  combination   of  physical  and  virtual  processes,  tools   and  technologies  to  support  co-­creation  of  design  and   construction

• Main  objectives

• First  understand  the  conceptual  underpinnings   of  the  Big  Room

• Develop  a  robust  collaborative  process  by  collaborating  lean   design  and  construction  tools  and  social  science  approach  in  

”knotworking”

• Develop  knowledge  based  Lean  and  BIM  tools  to  support   collaborative  design

• Develop  specific  interfaces  to  support  design  and  construction  in   a  collaborative  way

1.12.2015 13

(14)

User  Interface  Candidate

1.12.2015 14 2. Establish a 24/7 Collaborative Environment

(15)

• Virtual Work Planning

• Tasks by locations

• Task Scheduling

• Task Managing

(16)

Conceptual  Representation  of  ViBR

1.12.2015 16

(17)

Intelligent  Products  – IoT in  construction

• A  product  centric  vision  

• The  contextual  operative  logic  of  a  product  individual   to   support  the  lifecycle  is  embedded  (or  linked)  within  

individual   components  already  from  the  design  phase.  

• The  vision  covers  the  lifecycle  of  the  production  process   from  design  to  construction  and  maintenance

– This  new  vision  will   help  designers  focus  on  value  provision  by   making  available   real-­life,  context  sensitive  data  from  previous   installations,  

– enable  self-­organization  of  construction  projects

– reduce  the  cost  of  owning  facilities,  facilitate  feedback  function   for  improving  product  design.

(18)

Intelligent  Products  – IoT in  Construction

(19)

Intelligent  Products

(20)

Other  research

• Case  Study  on  Design  Management:  Inefficiencies  and   Possible  Remedies

• Suggestions  to  improve  lean  construction  planning

• What  Is  a  Good  Plan?

• Exploring  the  Recurrent  Problems  in  the  Last  Planner   Implementation  on  Construction  Projects

• Design  management  practices  between  structural  and   building   services  design  

(21)

Summary

• A  major  research  project

• Outputs  range  from  practical  applications  to  visionary   research

• Helping  set  the  agenda  for  construction  research  

including   Lean,  BIM  and  Technology  for  coming  years

– Would  not  have  been  possible  without  the  collaboration  with  the   BIM  initative and  BIMforLean!

• Legacy  will  continue  through  ongoing  research  projects

Viittaukset

LIITTYVÄT TIEDOSTOT

Jos valaisimet sijoitetaan hihnan yläpuolelle, ne eivät yleensä valaise kuljettimen alustaa riittävästi, jolloin esimerkiksi karisteen poisto hankaloituu.. Hihnan

Mansikan kauppakestävyyden parantaminen -tutkimushankkeessa kesän 1995 kokeissa erot jäähdytettyjen ja jäähdyttämättömien mansikoiden vaurioitumisessa kuljetusta

Järjestelmän toimittaja yhdistää asiakkaan tarpeet ja tekniikan mahdollisuudet sekä huolehtii työn edistymisestä?. Asiakas asettaa projekteille vaatimuksia ja rajoitteita

Ana- lyysin tuloksena kiteytän, että sarjassa hyvätuloisten suomalaisten ansaitsevuutta vahvistetaan representoimalla hyvätuloiset kovaan työhön ja vastavuoroisuuden

Työn merkityksellisyyden rakentamista ohjaa moraalinen kehys; se auttaa ihmistä valitsemaan asioita, joihin hän sitoutuu. Yksilön moraaliseen kehyk- seen voi kytkeytyä

EU:n ulkopuolisten tekijöiden merkitystä voisi myös analysoida tarkemmin. Voidaan perustellusti ajatella, että EU:n kehitykseen vaikuttavat myös monet ulkopuoliset toimijat,

The new European Border and Coast Guard com- prises the European Border and Coast Guard Agency, namely Frontex, and all the national border control authorities in the member

The US and the European Union feature in multiple roles. Both are identified as responsible for “creating a chronic seat of instability in Eu- rope and in the immediate vicinity