Improving environmental assessment by adopting good practices and tools of

multi-criteria decision analysis

ANNUAL REPORT

1.8.2013-31.7.2014

(2)

The actions finished in IMPERIA by 31.7.2014 and the actions planned to

be conducted before the end of the project

2012 2013 2014 2015

31.7.2014 Literature review, case analysis and

interviews

3 pilot projects + 5 mini pilot projects

Developing and testing of tools

Written guidance for using IMPERIA products Training and informing the

practitioners

IMPERIA AIMS TO IMPROVE THE QUALITY AND EFFECTIVENESS OF EIA PROJECTS

To inform the EIA practitioners

about good practices and train them to use

new tools Develops systematic tools for assessing impact significance,

comparison of alternatives and conduction of public participation Searches for, develops and reports good practices to support the

phases of environmental impact assessment

(3)

Assessment of impact significance

ARVI: tool for impact significance assessm.

HARAVA –tool for public participation Comparison of alternatives

Guidance (incl. internet guide) Pilot projects and minipilots

Dissemination (incl. international articles)

The utilisation of resources and progression of the central actions of the project by 31.7.2014

Proportion of the workload left on 31.7.2014

Annual report 1.8.2013-31.7.2014

(4)

Annual report 1.8.2013-31.7.2014 4

o Impact significance assessment was examined using national and international EIA documents as a source.

o Assessment framework based on the magnitude of impact and sensitivity of the receptor was created to enhance the impact significance assessment.

o The first version of project type dependent classification of impacts was completed in June 2014

Classification of the impacts associated with different project types are developed further.

ASSESSMENT OF IMPACT SIGNIFICANCE

ARVI -TOOL

o The first test version of ARVI-tool was released 30th of September in 2013

o ARVI-tool was used in Piiparinmäki- Lammaslamminkangas wind farm EIA (the first pilot project of IMPERIA)

o ARVI was introduced at the national EIA-meeting 19th of March in 2014

o ARVI has been tested by several environment consultants and other EIA practitioners

ARVI-tool is translated to English in order to use the tool in the Balticconnector gas pipe project EIA (fifth of the IMPERIA mini pilots).

ARVI-tool is developed further using the experiences from test users and pilot projects.

Focus of development work is in the usability of the tool and in the features related to comparison of alternatives in EIA.

(5)

Annual report 1.8.2013-31.7.2014 5

COMPARISON OF ALTERNATIVES HARAVA -TOOL

o IMPERIA has acted as a pilot for HARAVA project http://portal.eharava.fi/en/ run by the government of Finland aiming to collect valuable information from the local residents in order to increase the base information needed in land-use planning.

o IMPERIA has produced project-type dependent questionnaires for HARAVA

o HARAVA was used in Piiparinmäki- Lammaslamminkangas wind farm EIA (the first pilot project of IMPERIA)

o Master’s thesis examining the use of HARAVA in EIA was finished 27th of February in 2014

IMPERIA is developing a practice of public participation based on the use of HARAVA.

The aim of the work is to create unambiguous and transparent way to collect opinions of local residents and other stakeholder groups during planning processes. In the development of HARAVA- questionnaires, special attention is given to the possible causes of bias frequently found in inquiry results.

o Features enhancing the comparison of project alternatives have been planned to be included in ARVI-tool

To find the most effective way to compare the alternatives, current practices are examined using literature and this information is applied in the development of ARVI-tool.

(6)

6

PILOT PROJECTS

MAJOR PILOT PROJECT Tasks conducted by IMPERIA Upcoming tasks of IMPERIA

EIA of Piiparinmäki-

Lammaslamminkangas wind farm IMPERIA participated the preparation of scoping report and EIS testing new practices and tools

Final report is prepared and evaluation of used methods is conducted for IMPERIA

EIA of wastewater management of Vihti

commune IMPERIA participated the preparation of

scoping report and EIS providing support in the assessment of impacts of project alternatives and a tool for the impact significance assessment

Report of the pilot project is prepared for IMPERIA

SEA of flood risk management plan for

the river Lapuanjoki IMPERIA participated the preparation of SEA

applying MCDA approach Report of the pilot project is prepared and evaluation is conducted for IMPERIA

MINOR PILOT PROJECT Tasks conducted by IMPERIA Upcoming tasks of IMPERIA

Water course risk assessment of new peat production areas in Southern Ostrobothnia

IMPERIA participated the preparation of the

assessment report applying MCDA approach The pilot project is evaluated for IMPERIA

Options for the drinking water supply of

the City of Oulu IMPERIA participated the preparation of the

assessment report applying MCDA approach The pilot project is evaluated for IMPERIA

SEA for the Regional Programme of

Northern Ostrobothnia IMPERIA participated the preparation of the

SEA applying MCDA approach The pilot project is evaluated for IMPERIA

EIA of wastewater management of the

City of Lappeenranta IMPERIA executed a HARAVA questionnaire an

reported the experiences from it The pilot project is evaluated for IMPERIA

EIA of Balticconnector gas pipeline

between Finland and Estonia IMPERIA participates the impact

significance assessment and preparation of EIS. The pilot project is evaluated for IMPERIA

(7)

Annual report 1.8.2013-31.7.2014 7

GUIDANCE

DISSEMINATION

o Good practices in EIA has been collected using literature and straight from the practitioners for example during the seminar on 13th on May in 2014

o Applying methods of MCDA in EIA has been examined using literature research. Additionally, a master’s thesis examining the joint use of MCDA and cost-benefit analysis was completed.

Using the collected information and development work of IMPERIA, guidance on the following themes are prepared for practitioners: Elements of good EIA, Impact significance assessment, Comparison of project alternatives, and Structured and interactive EIA process

The guidance material is also reproduced to be published in the internet

o Members of IMPERIA project group have presented the projects in different events such as national EIA meeting and international EIA conference (IAIA14, Chile)

o IMPERIA and its pilot projects have gained media attention in local media and professional papers.

o IMPERIA has arranged seminars and training sessions in which the output of the projects and their use has been presented to EIA practitioners.

Website of IMPERIA http://imperia.jyu.fi is frequently updated and special attention is taken to the pages in English.

IMPERIA and its outputs are presented in diffrenet occasions and for example environmental consultants are invited to agree on tailored information and training sessions.

(8)

Coordinator

Finnish Environment Institute Leading expert Mika Marttunen mika.marttunen@ymparisto.fi

Partners

University of Oulu/ Thule-institute University researcher

Timo P. Karjalainen

timo.p.karjalainen@oulu.fi

University of Jyväskylä University teacher Elisa Vallius elisa.vallius@jyu.fi

Ramboll Finland Ltd

Leading expert Joonas Hokkanen joonas.hokkanen@ramboll.fi

SITO Ltd

Director of Sito Environment Sakari Grönlund

sakari.gronlund@sito.fi

Viittaukset

LIITTYVÄT TIEDOSTOT

Finally, the Resolution states that the monitoring and following of the SDGs and its goals “will be informed by an annual progress report on the Sustainable

The Parliament which was elected in March 2003 showed that the pro- cedure for forming the Government and elect- ing the Prime Minister under the new Consti- tution and according to

The annual report contains the necessary information concerning the or- ganization of the Parliamentary Office, legislative work, work in committees, international

At the end of the 2004 session, the special committees were still in the process of handling sixty Government bills, several white papers and reports submitted by the Government,

The handling of matters in the European Union typically takes longer than one session, and around 700 U and E matters were under consideration in the Grand Committee, which

It notes that, while maintaining a cross-cutting approach to lifelong guidance policy development across sectors, a primary objective has been to deepen the interfaces

Jätteiden käsittelyn vaiheet työmaalla ovat materiaalien vastaanotto ja kuljetuspak- kauksien purku, materiaalisiirrot työkohteeseen, jätteen keräily ja lajittelu

Työn merkityksellisyyden rakentamista ohjaa moraalinen kehys; se auttaa ihmistä valitsemaan asioita, joihin hän sitoutuu. Yksilön moraaliseen kehyk- seen voi kytkeytyä