in_bo New Frontiers of Construction Management Workshop 2018, vol. 09 n° 13

organisations and they have arranged rules and procedures about how practicalities

management.

Core Project Team As a Management Entity for Construction Projects

21

Marko Keinänen

Kalle Kähkönen

(2)

The construction industry is a project- based industry and they have their

common, that projects are undertaken

company in the construction industry and its specialists present two types

projects. The result can be a rather

structure has been shown in Figure 1.

in practice, this is rarely the case, but

management. The diagram shows

general contractor and subcontractors

Traditionally construction project organisations were determined by the

organisational arrangements has arisen

the construction industry are organised through temporary organisations,

own perspectives, which has caused a

which have been attempt to solve

continuously seek to establish new imperative cooperation between people and project partners.

management entitled core team. The team is, who are involved and how many people belong to the core team.

and is it inside one company or is it are under study. Accomplish this, the

(3)

in_bo New Frontiers of Construction Management Workshop 2018, vol. 09 n° 13

organised in various ways. The approach projects, which are still used in many a project manager or leader. With the contractor, an architect is responsible project based on a competitive tender.

a project manager has been given practically absolute control over their

has widely acknowledge practical

project meaning co-operation between an architect, structural engineer, electric

is demanded but to reach top quality solutions, smoothly operating team encourage open communication and within the team as well outside the team

in the organisation.

teams and workgroups that can be project. These are usually established needs such as architectural design, main supplies, site operations etc.

is aspiration to work in collaborative

core teams. Dothey have knowledge

involved’ relates people involved and

inside a company or are several level integration in construction projects

project deliveries, which as a whole is teams and team thinking in construction

that there can be some industrial have impact on the management practices around construction projects.

The research behind this paper is on the

how they are organised including their assignments.

(4)

solutions one should acknowledge team has been mentioned in the project the construction industry, although only organisation, core team has been mentioned in the project management literature.

project team organisation developed by

been mentioned in the literature on

management (Eppler and Sokowski,

new product development (Marion

core team is.

and coordination. These people project team. The core team members know the projects and its objectives.

They have developed the ideas, set

the core team which Anthony described

(5)

in_bo New Frontiers of Construction Management Workshop 2018, vol. 09 n° 13

project team is support and contributes

completed. According to Kaushik (et project delivery decisions.”

that project managers and other project

a core projects Team approach in the

where the project manager, the client, the principal engineer, the architect and core team.

integrated project delivery where the owner, the architect and the contactor also acknowledged that large projects project teams where core team is at

generate their own core teams and the

would be able to serve the project in that team members in a collaborative construction project should, “be equally committed to a common purpose, goals hold themselves mutually accountable”

but also “deeply committed to one another’s personal growth and success”

Research methodology and approach was used in order to understand the

Empirical data was obtained by a survey

manager and director level

obtained. All respondents were over

had third level educational background.

answers were broken into lines, each representing an item that can be captured with a keyword. From this

grouped into clusters, which were built

Thus, data was treated through several successive reductive phases, it was

ensure that the data was not being categories represent the data.

(6)

the term core team to mean a special

and how widely it is known. Among

organisational arrangement in their construction businesses. They have used or they have known used the Question, “did the core team belong to

arrangement in their organisation. The arrangement.

core team varies during the project”.

The question divided respondents into two sections.

been presented in Figure 5.

(7)

in_bo New Frontiers of Construction Management Workshop 2018, vol. 09 n° 13

According to respondents, there were mentioned. The smallest contained people was eight. Most common team

core team vary during the project, the core teams were asked. The amount

wary between three and twelve. The

The gained results propose that core teams or multi-company ones respondents have participated the work relation with other companies. Based

internal core teams.

Based on the survey, 66 core teams

procurement and accounting in the

has been collected into the trade

team. This was studied with a particular open question. The respondents named the three most important tasks, which have been assigned to the core team in question. The total number them named three tasks. The tasks were grouped into clusters, which were treated through several successive third party. The independent third party was used to ensure that the data was the categories represent the data. The total is been presented in Figure 7.

were mentioned as participants in grouped into clusters, treated through several successive reductive phase third party was used to ensure that the clusters. The relevant trade clusters that were recognised are construction management, site operations, design, procurement and accounting,

seller or logistic manager, which were

team were calculated only one. This core teams was determined. Figure 6 clusters in relation to the core teams.

Based on the survey at least one member with background in construction

processes.

personnel involved is primary on the their activities throughout preparative work, cooperative actions and daily problem solving. Thus, when it was a construction project do, the typical

core team, the respondents answered the main assignment was to take care The schedule control came close to this

(8)

The construction industry can be based industry where the operations

is drowned by a hierarchical manner where part optimisation procedures

the high-level integration is seen as a key

members but consequences might be the

The result is part-optimum decision

participants. A core team is an optional construction project teams.

were settled by the arrangements

organisational arrangements has arisen

with their own perspectives, which has

structures and linkages are sought to stakeholders.

The team design is understood as a core which as a whole is highlighting the

and partnering arrangements have been used to attempt to integrate the construction project delivery team (Love,

superimposed onto environments where

provides more value adding collaboration between project partners.

The core team is an interesting management arrangement in teams as an approach are particularly the core team can bring together the key

members the responsibilities are shared

avoided and decisions are made based

selected their own core teams and there

project.

project, thus tackle the management

managing a project.

(9)

in_bo New Frontiers of Construction Management Workshop 2018, vol. 09 n° 13

A typical construction project is an organisations brought together. The challenge is to organise the participants

concept core team has been recognised

organisational arrangements in

reported being like this. Usually a project

the project. The core team can be

organised inside one company, but it interorganisational are a somewhat

that construction management and site operations were the most represented least one member in the core team.

During a construction project, the tasks

and make decisions.

We see the core team as an important

mandates, contractual recognitions, established approached and decision- making practices are the dimensions where developments should take place.

project teams as project structuring approaches.

(10)

The

Concurrent Engineering to Construction

Research Technology

Rethinking construction.

Regions, London

, Strategic

Manging Team

An design and construction

,

construction sector,

Architectural Management, 17, 1.

- Social and Behavioural Sciences

The

Sri Lanka

Blackwell Science Ltd. UK.

Integrated

. construction management, Routledge, London.

.

Ltd, UK.

J. Ross publishing, USA.

Viittaukset

LIITTYVÄT TIEDOSTOT

The results in Table 5 show that the p-values (0.761, 0,291, 0.085, 0.429, 0.942 and 0.752) for correlation between the professional experience of project managers and the levels

Construction project cost estimation may be regarded as a pivotal activity for contractor’s ten- dering phase decision making, pricing, and project management. In the

Each core team type might fit for different types of project very unique spaces might need a content expert core team; end user executives might be need in strategic facility

One of the team members mentioned that communication was a significant challenge for the team, while others mentioned the lack of technical skills, time management, and early

· Määrittää usean osapuolen projektin uudet toimintatavat sähköisen tiedon- siirron ympäristössä, jotta saatavissa olevat hyödyt voidaan saavuttaa..

The CoMoViWo, Communication in Mobile and Virtual Work, project idea originated from the need to learn what kinds of online communication skills are required in a

Self discipline and day to day experience of team members in project management will help building effective virtual teams where managers can easily apply high level communication

The project teams have frequent internal meetings and in the weekly management team meetings the student project managers report about the projects to TUAS